Skip to Content Facebook Feature Image

Red Falcon completes first training for Zhuhai Airshow

China

China

China

Red Falcon completes first training for Zhuhai Airshow

2024-11-08 18:46 Last Updated At:19:37

The Red Falcon Aerobatic Team of the Chinese People's Liberation Army (PLA) Air Force completed its first adaptive training Friday morning for the 15th China International Aviation and Aerospace Exhibition, or Zhuhai Airshow.

Eight planes of the Red Falcon will perform stunts at the air show scheduled for Nov 12 to 17 in Zhuhai of south China's Guangdong Province.

The team designed more than 20 aerobatic maneuvers in three sets for different weather conditions at the air show.

"The training went smooth. Our team will present some special highlight moves at the air show. We feel honored and proud to be able to compete with so many prominent aerobatic teams and multiple types of advanced warplanes and present fascinating performances," said Zhang Li, a pilot of the Red Falcon Aerobatic Team.

Red Falcon completes first training for Zhuhai Airshow

Red Falcon completes first training for Zhuhai Airshow

Next Article

Xiamen-Kinmen Bridge enters marine construction stage

2024-12-03 20:39 Last Updated At:21:17

The Xiamen-Kinmen Bridge (Xiamen section) entered a new phase of marine construction on Monday morning, marked by the completion of the east tower's piling work of the Liuwudian Channel Bridge, a pivotal component of the project, in Xiamen of Fujian Province in east China.

The Xiamen-Kinmen Bridge (Xiamen section) spans 17.34 km and is designed to link the Xiamen island with the Xiamen Xiang'an International Airport that is currently under construction. The Liuwudian Channel Bridge is the province's first offshore suspension bridge and largest span bridge with a total length of 1,948 meters and a main span of 928 meters in length.

The pile foundation of the east bridge tower was completed on Monday after four months of work, while that of the west one is expected to finish at the end of this month.

Confronted with complex geological conditions and the challenge of transporting materials to the offshore construction site, the team newly built a large-scale mixing station and employed six rotary drilling rigs which operated around the clock.

With a total investment of 37.27 billion yuan (about 5.12 billion U.S. dollars), the Xiamen-Kinmen Bridge (Xiamen section) will become the most efficient connection between the Xiamen island and the Xiang'an Airport. Once completed, it will ease traffic congestion and greatly enhance transport efficiency in the region.

The Xiamen-Kinmen Bridge (Xiamen section) started construction in October 2023, and is expected to be completed simultaneously with the Xiang'an Airport Expressway in 2026.

Kinmen is an important hub for interaction across the Taiwan Strait. Growing trade and commercial links between Kinmen and Xiamen have made the building of the bridge a common desire of many people in the region.

Xiamen-Kinmen Bridge enters marine construction stage

Xiamen-Kinmen Bridge enters marine construction stage

Recommended Articles