Skip to Content Facebook Feature Image

Kobo Resources Strengthens Gold Mineralisation at Kossou Intersecting 9.0 m at 3.60 g/t Au and 8.0 m at 2.54 g/t Au

Business

Kobo Resources Strengthens Gold Mineralisation at Kossou Intersecting 9.0 m at 3.60 g/t Au and 8.0 m at 2.54 g/t Au
Business

Business

Kobo Resources Strengthens Gold Mineralisation at Kossou Intersecting 9.0 m at 3.60 g/t Au and 8.0 m at 2.54 g/t Au

2025-11-20 20:30 Last Updated At:11-21 15:57

QUEBEC CITY--(BUSINESS WIRE)--Nov 20, 2025--

Kobo Resources Inc. (" Kobo” or the " Company ") ( TSX.V: KRI ) is pleased to announce results of a further 12 boreholes from its ongoing diamond drill program at the 100%-owned Kossou Gold Project (“ Kossou ”) in Côte d’Ivoire, West Africa. The latest 12 boreholes total 2,755 metres (“ m ”) of drilling, bringing cumulative diamond drilling at Kossou to 26,267 m and total drilling completed to 32,154 m.

More Images
Figure 5: Road Cut Zone Simplified Cross Section – RCZ400

Figure 5: Road Cut Zone Simplified Cross Section – RCZ400

Figure 4: Road Cut Zone Drill Hole Locations and Simplified Geology

Figure 4: Road Cut Zone Drill Hole Locations and Simplified Geology

Figure 3: Jagger Zone Simplified Cross Section – JZ600

Figure 3: Jagger Zone Simplified Cross Section – JZ600

Figure 2: Jagger Zone Simplified Cross Section – JZ550

Figure 2: Jagger Zone Simplified Cross Section – JZ550

Figure 1: Jagger Zone Drill Hole Locations and Simplified Geology

Figure 1: Jagger Zone Drill Hole Locations and Simplified Geology

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20251120011105/en/

Diamond Drill Results – Highlights:

Jagger Zone:

Road Cut Zone:

Edward Gosselin, CEO and Director of Kobo commented: “The latest results at Jagger and Road Cut Zone give us further confidence in the interpretation and modelling of the principal mineralised shears at Kossou. These results continue to strengthen the resource potential we are currently defining on the Jagger and Road Cut Zone targets.”

He continued: “We continue with our aggressive exploration campaign in the district, currently evaluating encouraging gold showings in new areas along the western parts of the Kossou permit, which we expect to generate drill targets, along with newly discovered artisanal workings at the Kadie Zone. With less than 25% of the licence systematically explored, we strongly believe our successful approach to date supports significant potential for additional discoveries and expansion of the resource base at Kossou.”

Jagger Zone Highlights

Well mineralised intersections are reported at the Jagger Zone between JZ500 and JZ600 (Jagger Structure 6) near surface, confirming the interpreted structural controls to gold mineralisation along the Jagger Shear Zone. See Figure 1 for a simplified geology map and drill hole locations.

Mineralisation grading 8.0 m at 2.82 g/t Au(KDD0110) (see Figure 3), 9.0 m at 3.60 g/t Au(KDD0111) (see Figure 2) and 7.0 m at 1.36 g/t Au ( KDD0115) was reported in Structure 6 at Jagger Zone in these boreholes. The mineralisation in KDD0110 is comparable to the mineralised intersection reported previously on the same drill section (borehole KDD0028 grading 8.0 m at 3.72 g/t Au ).

A broad mineralised zone grading 26.0 m at 0.60 g/t Au (Figure 3) was also intersected in the upper 25.0 m oxidised zone near surface in KDD0110 in central parts of the shear zone.

Road Cut Zone Highlights

Drilling at the Road Cut Zone has focused on two main targets identified to date. The main shear intersected previously on RCZ800, together with mineralisation associated with the Contact Zone Fault and the shears in close proximity of this first order fault. See Figure 4 for simplified geology map and drill hole locations.

Borehole KDD0112 on Section RCZ400 intersected 5.0 m at 3.42 g/t Au associated with the northern strike continuation of the artisanal mine shear zone (see Figure 5). Anomalous grades (0.20-0.25 g/t Au) were also reported along Contact Zone Fault on this section. Borehole KDD0114 on RCZ350 intersected mineralisation grading 4.0m at 0.96 g/t Au confirming the quartz veining and alteration along the Contact Zone Fault to the north of that previously reported.

Encouraging gold intersections have also been reported along the one of the main shears within the mafic package associated with a well-defined shear on RCZ800. All 3 boreholes in the area intersected the well-developed shear zone. The best intersection was in borehole KDD0118 on RCZ825 (4.0 m at 3.47 g/t Au), with more anomalous intercepts in KDD0121 on RCZ750 (2.0 m at 2.27 g/t Au and 3.0 m at 1.34 g/t Au) and KDD0116 on RCZ800 (4.0 m at 0.80 g/t Au).

Table 1: Summary of Significant Diamond Drill Hole Results

An accurate dip and strike and controls of mineralisation are unconfirmed and mineralised zones are reported as downhole lengths. Drill holes are planned to intersect mineralised zones perpendicular to interpreted targets. All intercepts reported are downhole distances, true widths are unknown.

Sampling, QA/QC, and Analytical Procedures

Drill core was logged and sampled by Kobo personnel at site. Drill cores were sawn in half, with one half remaining in the core box and the other half secured into new plastic sample bags with sample number tickets. Core samples are drilled using HQ core barrels to below the level of oxidation and then reduced to NQ core barrels for the remainder of the bore hole. Samples are transported to the SGS Côte d’Ivoire facility in Yamoussoukro by Kobo personnel where the entire sample was prepared for analysis (prep code PRP86/PRP94). Sample splits of 50 grams were then analysed for gold using 50g Fire Assay as per SGS Geochem Method FAA505. QA/QC procedures for the drill program include insertion of a certificated standards every 20 samples, a blank every 20 samples and a duplicate sample every 20 samples. All QAQC control samples returned values within acceptable limits.

Review of Technical Information

The scientific and technical information in this press release has been reviewed and approved by Paul Sarjeant, P.Geo., who is a Qualified Persons as defined in National Instrument 43-101. Mr. Sarjeant is the President and Chief Operating Officer and Director of Kobo.

About Kobo Resources Inc.

Kobo Resources is a growth-focused gold exploration company with a compelling new gold discovery in Côte d'Ivoire, one of West Africa’s most prolific and developing gold districts, hosting several multi-million-ounce gold mines. The Company’s 100%-owned Kossou Gold Project is located approximately 20 km northwest of the capital city of Yamoussoukro and is directly adjacent to one of the region’s largest gold mines with established processing facilities.

With over 26,200 metres of diamond drilling, nearly 5,900 metres of reverse circulation (RC) drilling, and 5,900 metres of trenching completed since 2023, Kobo has made significant progress in defining the scale and prospectivity of its Kossou’s Gold Project. Exploration has focused on multiple high-priority targets within a 9+ km strike length of highly prospective gold-in-soil geochemical anomalies, with drilling confirming extensive mineralisation at the Jagger, Road Cut, and Kadie Zones. The latest phase of drilling has further refined structural controls on gold mineralisation, setting the stage for the next phase of systematic exploration and resource development.

Beyond Kossou, the Company is advancing exploration at its Kotobi Permit and is actively expanding its land position in Côte d'Ivoire with prospective ground, aligning with its strategic vision for long-term growth in-country. Kobo remains committed to identifying and developing new opportunities to enhance its exploration portfolio within highly prospective gold regions of West Africa. Kobo offers investors the exciting combination of high-quality gold prospects led by an experienced leadership team with in-country experience. Kobo’s common shares trade on the TSX Venture Exchange under the symbol "KRI”. For more information, please visit www.koboresources.com.

NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Cautionary Statement on Forward-looking Information:

This news release contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: general business, economic, competitive, political and social uncertainties; and the delay or failure to receive board, shareholder or regulatory approvals. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this news release. Except as required by law, Kobo assumes no obligation and/or liability to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law.

Figure 5: Road Cut Zone Simplified Cross Section – RCZ400

Figure 5: Road Cut Zone Simplified Cross Section – RCZ400

Figure 4: Road Cut Zone Drill Hole Locations and Simplified Geology

Figure 4: Road Cut Zone Drill Hole Locations and Simplified Geology

Figure 3: Jagger Zone Simplified Cross Section – JZ600

Figure 3: Jagger Zone Simplified Cross Section – JZ600

Figure 2: Jagger Zone Simplified Cross Section – JZ550

Figure 2: Jagger Zone Simplified Cross Section – JZ550

Figure 1: Jagger Zone Drill Hole Locations and Simplified Geology

Figure 1: Jagger Zone Drill Hole Locations and Simplified Geology

MONTERREY, Mexico (AP) — The 48-team field for FIFA ’s biggest ever World Cup is complete after a qualifying process that spanned more than two and a half years.

Iraq edged Bolivia 2-1 in an intercontinental playoff at Monterrey in northern Mexico on Tuesday to secure the 48th spot, hours after Bosnia and Herzegovina upset four-time champion Italy on penalties in European playoffs. The result meant Italy was knocked out in qualifying for a third successive World Cup.

Eight teams from Europe were competing for four places on the last day of qualifying. The new intercontinental tournament staged in Mexico determined the other two remaining places. The next-to-last nation to advance was Congo, which edged Jamaica 1-0 in extra time at Guadalajara, Mexico.

Sweden, Turkey and the Czech Republic each qualified in European playoff finals.

Sweden beat Poland 3-2; Turkey edged Kosovo 1-0; and the Czech Republic beat Denmark in a penalty shootout.

The World Cup kicks off June 11 and will be co-hosted by the United States, Mexico and Canada. It will feature 12 groups of four teams.

With its big upset victory of Italy, Bosnia and Herzegovina qualified to join Canada, Qatar and Switzerland in Group B.

Sweden will play in Group F with the Netherlands, Japan and Tunisia. Turkey will be in Group D with the United States, Paraguay and Australia.

After reaching its first World Cup since 2006, the Czech team will play in Group A with Mexico, South Africa and South Korea.

The World Cup qualifiers for the 2026 tournament started Sept. 7, 2023 with matches in South America.

Group A

Mexico, Czech Republic, South Africa, South Korea

Group B

Canada, Bosnia and Herzegovina, Qatar and Switzerland

Group C

Brazil, Haiti, Morocco, Scotland

Group D

United States, Australia, Paraguay, Turkey

Group E

Curacao, Ecuador, German,y Ivory Coast

Group F

Netherlands, Japan, Sweden, Tunisia

Group G

Belgium, Egypt, Iran, New Zealand

Group H

Cape Verde, Saudi Arabia, Spain, Uruguay

Group I

France, Norway, Senegal, Iraq

Group J

Algeria, Argentina, Austria, Jordan

Group K

Colombia, Congo, Portugal, Uzbekistan

Group L

Croatia, England, Ghana, Panama

This list has been corrected to show that Congo, not Jamaica, got the final spot in Group K.

AP soccer: https://apnews.com/hub/soccer

DR Congo's players and fans celebrate at the end of the World Cup playoff final soccer match between DR Congo and Jamaica in Guadalajara, Mexico, Tuesday, March 31, 2026. (AP Photo/Eduardo Verdugo)

DR Congo's players and fans celebrate at the end of the World Cup playoff final soccer match between DR Congo and Jamaica in Guadalajara, Mexico, Tuesday, March 31, 2026. (AP Photo/Eduardo Verdugo)

Bosnia's Esmir Bajraktarevic celebrates after winning a penalty shootout during the World Cup qualifying playoff final soccer match between Bosnia and Italy in Zenica, Bosnia, Tuesday, March 31, 2026. (AP Photo/Armin Durgut)

Bosnia's Esmir Bajraktarevic celebrates after winning a penalty shootout during the World Cup qualifying playoff final soccer match between Bosnia and Italy in Zenica, Bosnia, Tuesday, March 31, 2026. (AP Photo/Armin Durgut)

Bosnia's Esmir Bajraktarevic celebrates after winning a penalty shootout during the World Cup qualifying playoff final soccer match between Bosnia and Italy in Zenica, Bosnia, Tuesday, March 31, 2026. (AP Photo/Armin Durgut)

Bosnia's Esmir Bajraktarevic celebrates after winning a penalty shootout during the World Cup qualifying playoff final soccer match between Bosnia and Italy in Zenica, Bosnia, Tuesday, March 31, 2026. (AP Photo/Armin Durgut)

Iraq's Aymen Hussein, left, is congratulated after scoring his side's 2nd goal during the World Cup playoff final soccer match between Iraq and Bolivia in Monterrey, Mexico, Tuesday, March 31, 2026. (AP Photo/Fernando Llano)

Iraq's Aymen Hussein, left, is congratulated after scoring his side's 2nd goal during the World Cup playoff final soccer match between Iraq and Bolivia in Monterrey, Mexico, Tuesday, March 31, 2026. (AP Photo/Fernando Llano)

Iraq's Aymen Hussein celebrates scoring his side's 2nd goal during the World Cup playoff final soccer match between Iraq and Bolivia in Monterrey, Mexico, Tuesday, March 31, 2026. (AP Photo/Fernando Llano)

Iraq's Aymen Hussein celebrates scoring his side's 2nd goal during the World Cup playoff final soccer match between Iraq and Bolivia in Monterrey, Mexico, Tuesday, March 31, 2026. (AP Photo/Fernando Llano)

Recommended Articles