Skip to Content Facebook Feature Image

Chinese shares close lower Monday

China

China

China

Chinese shares close lower Monday

2026-11-16 16:38 Last Updated At:17:11

Chinese stocks closed lower on Monday, with the benchmark Shanghai Composite Index down 0.87 percent to 3,602.57 points.

The Shenzhen Component Index closed 2.53 percent lower at 10,690.78 points.

Turnover of stocks covered by these two indices totaled about 1.48 trillion yuan (around 220.43 billion U.S. dollars), down from 1.67 trillion yuan on the previous trading day.

Shares related to the semiconductor and co-packaged optics sector led the declines. Bucking the trend, the banking sector shares rose and those related to household appliance led the gains.

The ChiNext Index, tracking China's Nasdaq-style board of growth enterprises, lost 4.37 percent to close at 2,320.02 points Monday.

The STAR Composite Index, which reflects the performance of stocks on China's sci-tech innovation board, closed 5.41 percent lower at 1,434.40 points on Monday.

Chinese shares close lower Monday

Chinese shares close lower Monday

Chinese shares close lower Monday

Chinese shares close lower Monday

China’s longest and largest-capacity carbon dioxide (CO2) pipeline went into operation on Sunday in the country’s northeast Jilin Province, according to the China National Petroleum Corporation (CNPC).

The Jilin Oilfield long-distance carbon dioxide (CO2) pipeline project is operated by CNPC Jilin Petrochemical. It is also the country's largest-diameter and highest-design-pressure CO2 long-distance pipeline, spanning the province’s three cities of Jilin, Changchun and Songyuan.

Its upstream end connects to Jilin Petrochemical's CO2 capture unit, and its downstream end links to the oil displacement and storage production area of Jilin Oilfield. The main line is close to 300 kilometers long, designed for 14.5 MPa, and can transport up to 3.3 million tonnes of CO2 per year.

During construction, technical personnel conducted targeted research, achieving multiple technological innovations and localization of key equipment.

"Wind and solar power supply the project with green electricity, providing green energy support for carbon reduction across the project's entire life cycle," said Ma Xiaohong, chief expert of Jilin Oilfield.

Currently, CNPC is using the pipeline as a trunk line to advance the regional layout of the carbon capture, utilization and storage (CCUS) industry. The supporting 800,000-tonne-per-year CO2 recovery project at Jilin Petrochemical upstream was fully put into operation in October, providing a stable gas source for the pipeline. As the region's trunk "carbon artery," the pipeline will support the subsequent expansion of CCUS scale.

China's longest, largest CO2 pipeline project starts operation in Jilin

China's longest, largest CO2 pipeline project starts operation in Jilin

Recommended Articles