Skip to Content Facebook Feature Image

Special Traffic Arrangements in Happy Valley for Race Day on June 25

HK

Special Traffic Arrangements in Happy Valley for Race Day on June 25
HK

HK

Special Traffic Arrangements in Happy Valley for Race Day on June 25

2025-06-25 09:54 Last Updated At:10:08

Special traffic arrangements for race meeting in Happy Valley

Special traffic arrangements will be implemented in Happy Valley today (June 25). The arrangements will last until the crowds have dispersed after the race meeting.

A. Traffic arrangements before the commencement of the first race

The following road closure and traffic diversions will be implemented from 50 minutes before the start of the first race for day racing, or from 6pm onwards for night racing:

1. Road closure

Southbound Wong Nai Chung Road between Queen’s Road East and the up-ramp outside the Hong Kong Jockey Club (HKJC) will be closed, except for vehicles heading for Aberdeen Tunnel.

2. Traffic diversions

- Southbound Wong Nai Chung Road between Village Road and the up-ramp outside the HKJC will be re-routed one way northbound;

- Traffic along eastbound Queen's Road East heading for Wan Chai and Happy Valley will be diverted to turn left to Morrison Hill Road;

- Traffic along southbound Morrison Hill Road heading for Happy Valley will be diverted via Sports Road and Wong Nai Chung Road;

- Traffic along Queen's Road East cannot turn right to Wong Nai Chung Road, except for vehicles heading for Aberdeen Tunnel;

- Traffic from Cross Harbour Tunnel heading for Queen's Road East will be diverted via the down-ramp leading from southbound Canal Road flyover to Morrison Hill Road to turn right at the junction of Wong Nai Chung Road and Queen's Road East; and

- Traffic from Cross Harbour Tunnel heading for Happy Valley or Racecourse will be diverted via the down-ramp leading from southbound Canal Road flyover to Canal Road East, southbound Morrison Hill Road, Sports Road and Wong Nai Chung Road.

B. Traffic arrangements before the conclusion of race meeting

The following road closure and traffic diversions will be implemented from about 35 minutes before the start of the last race:

1. Road closure

- The up-ramp on Wong Nai Chung Road outside the HKJC leading to Aberdeen Tunnel;

- Southbound Wong Nai Chung Road between Queen's Road East and the up-ramp leading to Aberdeen Tunnel;

- Southbound Wong Nai Chung Road between Village Road and the Public Stands of the HKJC;

- Westbound Leighton Road between Wong Nai Chung Road and Canal Road East; and

- Southbound Morrison Hill Road between Leighton Road and Queen's Road East.

In addition, southbound Wong Nai Chung Road between the up-ramp leading to Aberdeen Tunnel and the Public Stands of the HKJC will be closed from about 10 minutes before the start of the last race.

2. Traffic diversions

- Eastbound Queen's Road East at its junction with Morrison Hill Road will be reduced to one-lane traffic heading for northbound Canal Road flyover;

- Traffic from Cross Harbour Tunnel heading for Wan Chai will be diverted via the down-ramp leading from southbound Canal Road flyover to Canal Road East, U-turn slip road beneath Canal Road flyover, Canal Road West and Hennessy Road;

- Traffic from Cross Harbour Tunnel heading for Happy Valley will be diverted via the down-ramp leading from southbound Canal Road flyover to Canal Road East, eastbound Leighton Road and Wong Nai Chung Road;

- Traffic along southbound Morrison Hill Road will be diverted to turn left to eastbound Leighton Road;

- Traffic along southbound Morrison Hill Road heading for Happy Valley will be diverted via eastbound Leighton Road and Wong Nai Chung Road; and

- Traffic along westbound Leighton Road will be diverted to Wong Nai Chung Road.

C. Learner drivers prohibition

Learner drivers will be prohibited to turn left from Caroline Hill Road to Leighton Road between one and a half hours before the start of the first race and one hour after the last race. In addition, learner drivers will be prohibited from accessing the following roads within the above period of time:

- Shan Kwong Road between Yik Yam Street and Wong Nai Chung Road;

- Village Road between its upper and lower junctions with Shan Kwong Road;

- Percival Street between Hennessy Road and Leighton Road;

- Canal Road East; and

- The service road leading from Gloucester Road to Canal Road flyover.

D. Suspension of parking spaces

Parking spaces on southbound Wong Nai Chung Road between Sports Road and Blue Pool Road will be suspended from 11am to 7pm for day racing, and from 5pm to 11.59pm for night racing respectively.

All vehicles parked illegally during the implementation of the above special traffic arrangements will be towed away without prior warning, and may be subject to multiple ticketing.

Actual implementation of road closure and traffic diversion will be made by the Police at the time depending on traffic conditions in the areas. Motorists should exercise tolerance and patience, and follow the instructions of Police on site.

Collecting preferences of Wang Fuk Court flat owners to advance long-term rehousing work

A Government spokesman said today (January 9) that social workers under the "one social worker per household" service of the Social Welfare Department (SWD) are proactively contacting flat owners of Wang Fuk Court, who were affected by the fire. They are comprehensively and systematically gathering each owner's preliminary preferences regarding long-term rehousing to assist in formulating and implementing specific plans.

The Chief Executive previously instructed the Task Force on Emergency Accommodation Arrangements to co-ordinate relevant policy bureaux and departments in studying long-term rehousing solutions. Adhering to the principles of "empathy, reason, and law", with priority given to "empathy", the Task Force aims to address the individual circumstances and preferences of residents while ensuring the efficient use of resources to assist affected households in rebuilding their homes.

The spokesman said, "Social workers from the SWD have been in contact with the residents, listening to their views, understanding their actual situations and needs, and providing necessary assistance. Regarding long-term accommodation, we have noticed differing opinions among flat owners and the community. For example, some hope that the Government will acquire the properties or give priority to Wang Fuk Court flat owners to purchase Home Ownership Scheme flats. Some residents seek local rehousing, while others accept rehousing in different districts. Some propose in-situ redevelopment, but there are also concerns about the lengthy waiting times.

"We hope to systematically and comprehensively collect Wang Fuk Court flat owners' opinions, further listening to and summarising their preferences. This includes identifying key principles that the Government should consider when addressing long-term accommodation arrangements and noting the flat owners’ initial preferences for different long-term rehousing options. This information will serve as a reference for the Government's follow-up actions."

Starting today, social workers under the SWD's "one social worker per household" service will begin contacting flat owners of Wang Fuk Court to gather their initial preferences regarding various long-term rehousing arrangements. The goal is to collect responses from the flat owners by mid-to-late January for analysis.

The spokesman said, "The Task Force will carefully compile and study the different preferences of flat owners and will conduct a comprehensive assessment based on the actual conditions at Wang Fuk Court, including structural safety, technical feasibility, and community planning. We aim to provide affected flat owners with suggestions regarding long-term proposals as soon as possible for their consideration and decision-making."

He said, "The Government and affected flat owners share a same objective: to implement solutions promptly and reassure them as soon as possible."

Following the fire, the Government arranged emergency accommodation for the affected residents of Wang Fuk Court in a short time frame. As of today, more than 4 400 residents are staying in hotels, youth hostels/camps, transitional housing, units from the Hong Kong Housing Society or Po Tin Interim Housing in Tuen Mun. Since December 22 last year, the Support Fund for Wang Fuk Court in Tai Po has provided each flat owner, in tranches, with a two-year rental subsidy up to a maximum of $300,000, giving them more flexibility and options in their accommodation arrangements.

Source: AI-found images

Source: AI-found images

Recommended Articles