Skip to Content Facebook Feature Image

Spanish Mountain Gold Drills 0.82 g/t Gold Over 139.82 Metres and a Second, Deeper High-Grade Intercept in the Same Drill Hole of 33.54 Metres Grading 2.19 g/t Gold

Business

Spanish Mountain Gold Drills 0.82 g/t Gold Over 139.82 Metres and a Second, Deeper High-Grade Intercept in the Same Drill Hole of 33.54 Metres Grading 2.19 g/t Gold
Business

Business

Spanish Mountain Gold Drills 0.82 g/t Gold Over 139.82 Metres and a Second, Deeper High-Grade Intercept in the Same Drill Hole of 33.54 Metres Grading 2.19 g/t Gold

2025-12-01 20:02 Last Updated At:12-06 10:38

VANCOUVER, British Columbia--(BUSINESS WIRE)--Dec 1, 2025--

Spanish Mountain Gold Ltd. (the " Company " or " Spanish Mountain Gold ") (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to provide additional assay results from exploration drill holes 25-DH-1297, 25-DH-1298, and 25-DH-1299 that were completed as part of its 2025 Fall Diamond Drill program (“ 2025 Fall Drill Program ”) for the Spanish Mountain Gold (“ SMG ”) project, which is located in the Cariboo Gold Corridor, British Columbia, Canada.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20251201261476/en/

The company has completed approximately 6,947 m of drilling has been completed to date of the 9,000 to 10,000 metres (“ m ”) of exploration drilling planned under the 2025 Fall Drill Program. Assays and geochemistry are pending on fifteen (15) additional drill holes completed on the newly defined Orca Fault area, and from five (5) completed drill holes on the A12 target.

Highlights:

Key Findings:

Main Deposit – Orca Fault area

Drill hole 25-DH-1299 (see Table 3) was designed to confirm the new Orca Fault target and intersected higher-grade mineralization (Figure 1), approximately 75 m south of drill hole 25-DH-1294 (Figure 3), which is on the next drill section line immediately to the north. It should be noted that 25-DH-1299 has two key intersections, the first interval near surface from 48.18 to 188.00 m of 0.82 g/t gold over 139.82 m, including 34.60 m of 2.17 g/t gold with a subset of 7.60 m of 7.09 g/t gold. The second interval came near the base of constraining open pit shell for the 2025 Mineral Resource Estimate (see July 3, 2025 news release) from 284.00 to 329.54 m, grading 1.67 g/t gold over 45.54 m, including 33.54 m of 2.19 g/t gold with a subset of 13.53 m of 4.79 g/t gold. This deeper intercept highlights the mineral potential at depth that will require additional drilling to further delineate, but investors should be cautioned it is not guaranteed that additional drilling will result in conversion of this area into the mineral resource estimate.

Drill hole 25-DH-1297 (Table 1) was designed at 45 m south from 25-DH-1294 (Figure 3) and it also successfully intersected higher-grade mineralization, 50.84 m grading 0.66 g/t gold from 44.76 to 95.60 m including 19.41 m of 1.12 g/t gold with a subset of 3.59 m of 2.30 g/t gold. Drill hole 25-DH-1298 (Table 2) was designed at 50 m southeast of 25-DH-1296 (Figure 3) and it intersected per plan 34.77 m of 0.48 g/t gold from 58.00 to 92.77 m (Figure 2).

The results from these three new exploration drill holes compare very favorably with the results of 25-DH-1281 and 25-DH-1282 (see April 21, 2025 news release), 25-DH-1292 and 25-DH-1293 (see November 3, 2025 news release), and 25-DH-1294 and 25-DH-1296 (see November 17, 2025 news release), continuing to prove that tighter exploration drill spacing at the preferred azimuth of 120-degrees is key to unlocking additional mineral potential in the Main deposit. These exploration drill holes are presented on a drill section (Figure 1 and Figure 2) that shows the alignment of the higher-grade mineralization to the new Orca Fault target.

Table 1: Assay Results for 25-DH-1297

Table 2: Assay Results for 25-DH-1298

Table 3: Assay Results for 25-DH-1299

The integration of assay results from 25-DH-1297, 25-DH-1298, and 25-DH-1299 with other recently released drill holes (see November 3 and 17, 2025 news releases), strengthens the continuity for the new Orca Fault target and the association of higher-grade mineralization over a strike length of 300 m, northwest to southeast (see Figure 1 and Figure 2) now spanning two parallel, adjacent drill sections. The current interpretation is that there is strong continuity between these section lines linking geology, structure and the higher-grade mineralization.

The mineralization in these drill holes occurs in faults and quartz-dominated veins that appear to extend for more than 25 m beyond each drill hole. Two dominant sets of veins were identified, high-angle and low-angle. The lower-angle veins (~45 degrees) occur in proximity to the Orca Fault (see November 3 and 17, 2025 news releases).

Figure 3 illustrates the locations for three drill hole results outlined in this news release and the drill holes currently in the assay lab, or in process of being drilled. Drill collar location coordinates are summarized for the 2025 Fall Drill Program in Table 4 at the end of this news release.

Abbreviations: metres = m, grams per tonne = g/t, gold = Au, mineral resource estimate = MRE, Spanish Mountain Gold = SMG

Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)

Once received from the drill and processed, all drill core samples were sawn in half, labeled, and bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and reference materials, for all sample shipments to monitor laboratory performance. Standards and blanks account for a minimum of 20% of the samples in addition to the laboratory’s internal quality assurance programs. The QAQC program was overseen by the Company’s Qualified Person, Julian Manco, P.Geo, Director of Exploration (as described below).

The data verification process involved a multi-step approach to ensure accuracy and integrity. This included a detailed quality control (QC) analysis of the data, which was performed using both internal and external platforms, such as the MxDeposit™ software. These QC checks involved the analysis of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, a field inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verified the nature of the results presented.

Drill core samples were submitted to MSALABS’s analytical facility in Prince George, British Columbia, for sample preparation and PhotonAssay TM analysis. The MSALABS facilities are accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with all analytical methods incorporating quality control materials at defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of the Company.

PhotonAssay TM

The PhotonAssay TM method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay TM instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1).

The PhotonAssay TM instrument bombards 400- to 600-gram samples contained in sealed containers with gamma rays. These containers remain sealed throughout the process, preserving the sample for potential further testing. The analysis is performed robotically, with results that integrate into existing laboratory management systems. Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed to ensure accurate and reliable results. The method offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000 ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results reviewed by a competent person before reporting.

Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of PhotonAssay TM results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish). QAQC Testing typically can include the following spot checks: 1) Pulverizing tests to evaluate variability in sample preparation, 2) Cross-analysis at external laboratories using screen metallic method, and 3) Four-cycle radiation testing to identify and calibrate potential variability in gold results with variable radiation intensity.

Multi-Elemental Analysis

For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-element determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis.

Key Process Steps:

Sample Preparation: Samples are dried and ground to a specific criterion (85% passing 75 microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required. Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric acids, followed by dilution with deionized water.

Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification. Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for spectral interferences and thorough review before final reporting.

Qualified Person

Julian Manco, M.Sc., P.Geo., Director of Exploration with Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.

About Spanish Mountain Gold Ltd.

Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold Project (Project) towards construction of the next gold mine in the Cariboo Gold Corridor, British Columbia. On August 18, 2025, the Company filed an NI 43-101 Technical Report on SEDAR+ that sets out the Project’s de-risked and optimized Preliminary Economic Assessment (PEA), with an updated Mineral Resource Estimate (MRE). We will continue to advance the Project to position the Company to make a construction decision in 2027. We are striving to be a leader in community and Indigenous relations by leveraging technology and innovation to build the 'greenest' gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities. Details on the Company are available on www.sedarplus.ca and on the Company's website: www.spanishmountaingold.com.

On Behalf of the Board,

“Peter Mah”
President, Chief Executive Officer and Director
Spanish Mountain Gold Ltd.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING INFORMATION:

Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to information with respect to, the potential for adding more higher-grade gold mineralization within the pit or below current pit design; and the timing and size (m) of the 2025 Fall Drill Program, and the results thereof. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.

Table 4: Drill Collar Information for Drill Holes

 

Figure 3: Drill Collar Location Map for 2025 Fall Drill Program

Figure 3: Drill Collar Location Map for 2025 Fall Drill Program

Figure 2: Drill Long Section Through Orca Fault Area (looking northeast); section line B-B’ (see Figure 3)

Figure 2: Drill Long Section Through Orca Fault Area (looking northeast); section line B-B’ (see Figure 3)

Figure 1: Drill Long Section Through Orca Fault Area (looking northeast); section line A-A’ (see Figure 3)

Figure 1: Drill Long Section Through Orca Fault Area (looking northeast); section line A-A’ (see Figure 3)

OKLAHOMA CITY (AP) — Shai Gilgeous-Alexander isn't scoring the way he usually does, but the Oklahoma City Thunder are still winning the way they normally do.

Gilgeous-Alexander, the reigning NBA MVP, averaged 31.1 points during the regular season. In the Western Conference semifinals against the Los Angeles Lakers, he is averaging 20 points and taking only 14 shots per game.

Oklahoma City has still won the first two games by an average of 18 points. Gilgeous-Alexander and Chet Holmgren each scored 22 points, and the defending champion Thunder beat the Lakers 125-107 on Thursday night.

Ajay Mitchell, starting in place of injured Jalen Williams, is averaging 19 points on 50% shooting in the series for Oklahoma City.

“I think the coaching staff does a good job at just getting all of us ready,” said Mitchell, a second-year guard. "And we have a lot of competitors. Like, everyone’s a competitor on our team. So every time the lights are bright, everyone’s ready to go.”

Holmgren is the leading scorer for the Thunder in the best-of-seven series with 23 points per game. The 2026 All-Star also is averaging 10.5 rebounds and 2.5 blocks.

Jared McCain, a midseason acquisition from the Philadelphia 76ers, barely played in the first round against Phoenix but has averaged 15 points and made 8 of 10 3-pointers in the series.

“He goes in there, stays in character, stays aggressive," Thunder coach Mark Daigneault said. "He’s going to shoot the next shot. He makes the right plays, plays inside the team. He competes defensively, has had good defensive possessions for us. And he was huge tonight. You need that in a playoff series.”

The Lakers again were without scoring champion Luka Doncic, who is out indefinitely with a strained left hamstring. They also were missing forward Jarred Vanderbilt, the reserve forward who dislocated the pinkie on his right hand during the second quarter of Game 1. The Lakers had three players finish with five fouls, limiting their aggressiveness late in the game.

Los Angeles guard Austin Reaves, who struggled with his shot in Game 1, scored 31 points on 10-for-16 shooting in Game 2. LeBron James, coming off a 27-point effort in Game 1, followed that up with 23.

With the Lakers up 63-61 early in the third quarter, Gilgeous-Alexander got tied up with Reaves and was called for his fourth foul. Upon review, it was upgraded to a flagrant 1 for Gilgeous-Alexander's follow through. Oklahoma City's Alex Caruso was called for a technical foul as the situation was being sorted out.

Gilgeous-Alexander left the game with the Lakers up 65-61, but the Thunder rallied and took control without him. On a fast break, Holmgren found a trailing Jaylin Williams, who hit a 3-pointer and was fouled. His free throw put the Thunder up 85-74.

The Thunder outscored the Lakers 32-15 while Gilgeous-Alexander was out in the third quarter to take a 93-80 lead into the fourth.

“It was amazing," Gilgeous-Alexander said. “They strung together stops, they’re playing the right way offensively and things are going their way. Full confidence in those guys. They know how to win basketball games. And we've proven that. They’ve proven that no matter who’s on the floor, they know how to get the job done. And they just did it again tonight."

The Lakers cut Oklahoma City's lead to five in the fourth quarter before the Thunder pulled away again.

Los Angeles will host Game 3 on Saturday.

“We just stuck with it,” Holmgren said. “It’s the game of basketball. It’s not always going to go your way. It’s about how you respond. And this team has proven many times that we know how to respond. And we did so tonight.”

This story has been corrected to show that Shai Gilgeous-Alexander is averaging 20, not 19, points per game against the Lakers.

AP NBA: https://apnews.com/hub/NBA

Oklahoma City Thunder's Chet Holmgren (7) shoots over Los Angeles Lakers' Austin Reaves (15) in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder's Chet Holmgren (7) shoots over Los Angeles Lakers' Austin Reaves (15) in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder guard Ajay Mitchell, front, works for a shot as Los Angeles Lakers' Austin Reaves, rear, defends in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder guard Ajay Mitchell, front, works for a shot as Los Angeles Lakers' Austin Reaves, rear, defends in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Los Angeles Lakers' LeBron James stands on the court in the second half of Game 2 in a second-round NBA basketball playoffs series against the Oklahoma City Thunder Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Los Angeles Lakers' LeBron James stands on the court in the second half of Game 2 in a second-round NBA basketball playoffs series against the Oklahoma City Thunder Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder guard Shai Gilgeous-Alexander (2) drives to the basket past Los Angeles Lakers' Deandre Ayton (5) and LeBron James, rear, in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder guard Shai Gilgeous-Alexander (2) drives to the basket past Los Angeles Lakers' Deandre Ayton (5) and LeBron James, rear, in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder center Chet Holmgren (7) works to the basket against Los Angeles Lakers forward Rui Hachimura (28) in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Oklahoma City Thunder center Chet Holmgren (7) works to the basket against Los Angeles Lakers forward Rui Hachimura (28) in the second half of Game 2 in a second-round NBA basketball playoffs series Thursday, May 7, 2026, in Oklahoma City. (AP Photo/Nate Billings)

Recommended Articles